FURNITURE PRODUCTION

The production process starts with our customers brief on what type of furniture they need. We then go to our drawing board to create that perfect furniture and on approval from them on the type of wood, color and accessories to be used, we go ahead to produce. Our minimal production time is two weeks, but this also depends on the urgency of the project and the work load in the production department.

After production, based on site readiness for installation, we send our team of carpenters for installation. However a pre-installation inspection is carried out before bringing the produced furniture to site. In cases where the installation site is an already occupied living space, all we do is deliver the finished product and install the need ones.

 
 
 
 
 
     
     
CONTACT US QUICK LINKS SOCIAL NETWORK
Plot 114 Apo Cadastral Zone,
Gudu District, Apo, Abuja- Abuja.
Factory – Saburi District, Dei-Dei, Abuja.
+234 (0) 806 853 6680
+234 (0) 703 951 2604
info@darchinteriors.com
About Darch
Our Featured Services
Our Product Photo Gallery
Download our Business Catalogue
Contact Us
Join us on Facebook
Follow us on Twitter
Join us on Houzz

   
Copyrights © 2014. www.darchinteriors.com All Rights Reserved